Best Ductless Mini Split Air Conditioner in Honolulu HI
Last year (2013) my wife and I went to Home Depot to have our two bathrooms remodeled. We signed contract in June and work could not start until building permits were obtained. Work began in September and lasted until January (we had to be home a total of 30 days for the work). This was due to: materials not being sent on time, materials had to be re-ordered because of damage in transit to our home and numerous scheduling conflicts. Contractors included Kitchen & Bath Remodeling, Commercial Plumbing, Clifford Okinaga, and EMK electrical. During this extended installation piles of materials were stacked on our front Lanai and one of our spare bedrooms. Workers did not use drop cloths and did not clean up after they finished work. To top it off, the upstairs shower leaked because the drain was broken during installation which required repair work that extended the installation time. To add insult to injury, someone from Home Depot is calling to say that we still owe them for the project even though have emailed to them that I have paid for every thing.
I will never step into a Home Depot again and my wife and I are telling our friends and relatives to never use Home Depot for their remodeling.
My rating: -1000
I will never step into a Home Depot again and my wife and I are telling our friends and relatives to never use Home Depot for their remodeling.
My rating: -1000
421 Alakawa St, Honolulu, HI 96817