Absolutely the worst subcontractor I have ever dealt with. Over $25,000 in damages from leaks and water damage at one structure. Refuses to perform the most fundamental level of presentation of invoices. Failed to perform work and use materials according to the spec. Can't even hang radiators straight and level. Damages the walls during radiator installation and never mentions it to the GC. Had to report deficiencies time after time and plumber refused to communicate as requested by contractor. Plumber got paid for completing the final Regional heating inspection, never showed up for it, and then lied that it had been successfully completed while the GC had to dedicate other resources to do the missing plumber's work. Absolutely abysmal, irresponsible, unprofessional performance. A pile of emails retained as evidence of the foregoing. See attached professional installation photo.
Edit: The heating system installed by this guy failed prematurely. I had to hire a company to fix several failed components. They pointed out how badly American Pride had installed the system. Even the copper pipe sweat joints were done poorly. Nearly $2000 to repair the premature failure problems.
To make matters worse, during the first cold period, about half of the water lines froze, due to improper location of the pex lines. Simply incompetent work.